Costs benefits and shared risk

Year 9 · Lesson 5 · Content 2026.11.02.1

All supplied-record lessons · Open interactive lesson

Supplied-record alternative. Enter your responses in your school assignment. These supplied results support learning but do not show that you ran an algorithm.

Your goal

Compare useful results, resources, people and shared failures before recommending a service.

To be able to recommend a service option using evidence about benefits, resource costs and shared risks.

Before you start

A free bus ride still uses fuel and staff. Which is an access price?

Choices: The fare paid / The fuel used

Bridge feedback after trying

A fare is a price. Fuel, electricity, equipment and work are resources even when access is free.

Words for this lesson

Compute
Calculation resources used to train or run a model.
Externality
A cost or benefit affecting others beyond the direct transaction.
Systemic risk
A shared failure spreading through connected services.

The idea

A zero access price does not mean zero resource cost. Training and repeated use need resources. Compare benefits with electricity, staff work and people affected. A shared provider can create a common failure point. State what an energy calculation includes before drawing conclusions. A smaller footprint inside one boundary does not measure every wider effect.

A completed example

Practice: 10 kWh training plus 2 kWh each week for 5 weeks gives 20 kWh. At an invented factor of 0.5 kg CO2e per kWh that is 10 kg CO2e within this boundary. Device manufacture is not included.

Check your understanding

kWh measures ...

  1. Energy
  2. Money
  3. Accuracy
Practice feedback after trying

Energy. Keep the unit attached to the amount.

A zero access fee means ...

  1. No stated access payment, while other costs remain
  2. No electricity
  3. No labour
Practice feedback after trying

No stated access payment, while other costs remain. Price and resources are different.

A shared provider outage means ...

  1. Several dependent functions may fail together
  2. Every system must fail
  3. Accuracy scores rise
Practice feedback after trying

Several dependent functions may fail together. Check the actual dependencies and fallbacks.

Task 1 · Make a prediction

Most stated ten-week electricity

Options: A / B / C / Not sure

Write your prediction, or state that you skipped it.

Try it using supplied records

  1. Predict which option will use most stated electricity over ten weeks.
  2. Choose A, B or C. Build the calculation: weekly electricity x ten, then add training.
  3. Apply the supplied fictional factor and calculate time saved. Show units at every step.
  4. Compare the complete result table and reveal who benefits, who does work and the common-provider outage card.

Calculated project totals · invented energy allocations

Complete data and source records

Fictional ten week project. Fictional teaching data.
OptionTraining allocation in kWhRunning kWh per weekCorrect out of 100Staff minutes saved per week
A shared cloud120696280
B smaller local20494200
C current computer-supported manual process01980
Read as stacked records
Option
A shared cloud
Training allocation in kWh
120
Running kWh per week
6
Correct out of 100
96
Staff minutes saved per week
280
Option
B smaller local
Training allocation in kWh
20
Running kWh per week
4
Correct out of 100
94
Staff minutes saved per week
200
Option
C current computer-supported manual process
Training allocation in kWh
0
Running kWh per week
1
Correct out of 100
98
Staff minutes saved per week
0
Project assumptions. Fictional teaching data.
ItemValue
Duration10 weeks
Emissions factor0.4 kg CO2e per kWh, invented for arithmetic, not a UAE grid claim
BoundaryStated training and running electricity allocation only; excludes device manufacture, networks and staff travel
Narrow pilot criterionAt least 93 correct in a representative 100-case test and an available manual review route; invented classroom brief
Read as stacked records
Item
Duration
Value
10 weeks
Item
Emissions factor
Value
0.4 kg CO2e per kWh, invented for arithmetic, not a UAE grid claim
Item
Boundary
Value
Stated training and running electricity allocation only; excludes device manufacture, networks and staff travel
Item
Narrow pilot criterion
Value
At least 93 correct in a representative 100-case test and an available manual review route; invented classroom brief
People and dependency cards. Fictional teaching data.
CardEvidence
ANo school access fee for the trial. Same provider supplies functions for three other school services; its outage may affect all four provider functions.
BNeeds local IT update skills and has a manual alternative.
CExisting baseline still uses staff time and computer electricity. Zero saved time is not zero work.
LabourBoth model options need approved data preparation and checking. Contracted annotation is a direct cost; wider working-condition harms need separate evidence.
Read as stacked records
Card
A
Evidence
No school access fee for the trial. Same provider supplies functions for three other school services; its outage may affect all four provider functions.
Card
B
Evidence
Needs local IT update skills and has a manual alternative.
Card
C
Evidence
Existing baseline still uses staff time and computer electricity. Zero saved time is not zero work.
Card
Labour
Evidence
Both model options need approved data preparation and checking. Contracted annotation is a direct cost; wider working-condition harms need separate evidence.

Expected results · supplied

These are supplied reference results. They are separate from your own explanation. No code needs to run to read them.

1. totalEnergy=training+weeks*weeklyRunning; estimatedEmissions=totalEnergy*0.4; timeSaved=weeks*weeklySaved. A running60,total180,72kg,2800min; B40,60,24kg,2000min; C10,10,4kg,0min saved. All meet narrow correctness criterion but A manual review route is not established by its card and must be specified before a pilot.

2. Core weeks fixed at ten. Optional extension changes weeks from 1 to 30, clearly marked a new scenario; update every total, unit and export record together. Restore ten on Reset. Do not infer carbon per real prompt from this dataset.

3. Stakeholder prompts cover pupils, staff, data workers, IT staff and people beyond the transaction. A contracted fee is a direct cost; pollution affecting other people is a possible external effect. Recommendations are rubric-assessed and may reasonably differ.

Help with this step

Hint 1

Keep electricity, emissions and saved time in different columns.

Hint 2

Multiply weekly use by ten before adding the one-off training allocation.

Hint 3

Practice: 5 kWh training plus 1 kWh for 4 weeks equals 9 kWh. Zero time saved means the baseline has not changed, not that no one works.

Task 2 · Use the evidence

  1. Recommend a limited pilot, the existing process or further comparison using usefulness, resources and time evidence.
  2. Name a direct cost, a possible external effect and a shared dependency.
  3. State the calculation boundary, a missing piece of evidence and a manual fallback.

My explanation

Write in your school assignment. Keep these answers in your own words.

Option A

Option B

Option C

Recommendation

People affected: Pupils

People affected: Staff

People affected: Data workers

People affected: IT staff

People affected: People beyond the transaction

Your explanation

Explain a fresh example

Recommend one option or further testing for this ten-week project. Use a benefit, a resource result, an affected group, a dependency or fallback, and one limit.

My confidence

I need another explanation / I can explain with help / I can explain with my own example

My next step

Write what you will do next.

Optional depth

Change duration in the extension. Which costs accumulate? What else would you need for a genuine whole-service environmental comparison?

What this activity can show

These energy allocations and factor are invented. The result is not a full footprint, a real price comparison or evidence about a named provider. Paid work is not automatically an externality.

This is a student learning record. Submission is completed through the school assignment system.